Link: Mission capability delivered at startup speed

More coverage of the US Air Force going all in on digital XP, lean design, and cloud native to dramatically – almost unbelievably so – modernize their software.

The mission capabilities these war fighters received in 120 days or less span deliberate targeting, mission reporting, advanced target production, refueling operations and many more, saving over $6.4 million and 1,100 man-hours per month within the Air Force Central Command.

More:

Embracing agile software development processes, the AOC leverages a highly disciplined approach to software engineering called Extreme Programming (XP), to gain the benefits of test-driven development, pair programming, continuous integration and continuous delivery (CI/CD).

Original source: Mission capability delivered at startup speed

Leave a comment

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.